Why a pneumatic conveying line has no fixed price list

Two lines can both move powder and still cost very different amounts. One may carry free-flowing pellets over 20 metres. Another may carry a fine, abrasive, moisture-sensitive powder over 80 metres with several bends and full dust filtration.

So we price a line after we understand the duty. The table below shows what moves the price, and the checklist shows what to send us so the quote is right the first time.

  • A written quote within one working day of a complete enquiry
  • Sized from your material, rate and route
  • No catalogue prices that ignore your layout

What moves the price

Thirteen things that change the cost of a line

Price factorWhy it changes the cost
Material typeFine, abrasive, sticky, fragile, hygroscopic, hot or hazardous material changes the equipment.
Bulk densityAffects how the solids flow, the pipe loading and the feeder size.
ThroughputMore kg/hr needs larger feeding, conveying and separation equipment.
Horizontal distanceA longer route raises the pressure drop and the blower size.
Vertical liftLifting material needs more pressure and affects the layout.
Number of bendsBends add pressure drop and wear, and can damage the product.
Pipe diameter and materialLarger pipe and stainless steel cost more to fabricate.
Blower pressure and airflowSets motor power, noise and running cost as well as the purchase price.
Rotary valve sizeA larger valve or a special material of construction changes the cost.
Cyclone and bag filterDust load and particle size decide the size of the separation equipment.
Automation levelA basic starter panel costs less than a PLC with sensors, interlocks and a VFD.
Site workSupports, erection, duct routing, civil work and commissioning all add to the budget.
Safety requirementCombustible dust, solvent vapour or hazardous powder needs extra review and safeguards.

Before we quote

Six facts we need to design your line

Do not worry if you do not have all of them. Send what you know, a rough sketch helps, and our engineers will ask for the rest.

1Material

Name, form (powder, granule, pellet), bulk density and particle size.

2Condition

Moisture, temperature at the feed point, and whether it is abrasive, corrosive, sticky or hygroscopic.

3Capacity

Throughput in kg/hr, average and peak.

4Route

Horizontal run and vertical lift in metres, and the number of bends.

5Points

Number of pickup points and delivery points.

6Site

Power supply, space limits, a layout sketch, and any GMP, ATEX or CPCB requirements.

Airflow calculator

How much air does your pipe need?

Set the pipe size, the air velocity and the material rate. See the airflow, the solids loading and whether the velocity sits in the usual dilute phase band.

0 m³/minconveying airflow
Airflow per hour
0 m³/hr
Air mass flow
0 kg/hr
Pipe cross-section
0 cm²
Solids loading ratio*
0 kg material per kg air
Get this line sized by an engineer

*Indicative only. Airflow = pipe area × air velocity. Solids loading = material mass flow ÷ air mass flow, with air at 1.2 kg/m³. Air expands along a long line and pressure drop, bends, lift and material behaviour change the real design, so we size every line from your material data.

Budgeting & Cost Engineering

Compare Day-1 equipment cost against 5-year blower power

An undersized pipeline or flat-curve blower lowers Day-1 steel weight but drives up annual electricity kWh and shutdown maintenance.

When reviewing vendor proposals, examine wetted metallurgy (IS 2062 mild steel vs SS 304 / SS 316L), rotary airlock pressure leakage allowance, long-radius bend wear liners, and dust collector cloth area side by side. For a detailed item-by-item cost breakdown covering CapEx levers and five-year kWh calculations, read our full engineering guide on pneumatic conveying system cost and RFQ inputs and review how to choose a blower for pneumatic conveying.

You can test baseline pipe diameter and solids loading before submitting an inquiry using our pneumatic conveying airflow calculator, or review worked design sizing equations on pneumatic conveying system price and design calculation and bag filter pricing and pressure-drop sizing.

Standards & Costing References

  • Conveyor Equipment Manufacturers Association (CEMA): Bulk Material Handling Engineering & Cost Benchmarking (cemanet.org).
  • Bureau of Energy Efficiency (BEE), Government of India: Industrial Blower & Motor Energy Efficiency Guidelines (beeindia.gov.in).

FAQ

Price and delivery questions

How do I get a quotation?

Use the quote form, call or WhatsApp us with your material, rate, conveying distance and layout. A conveying engineer replies within one working day with a recommendation, and a quote once the duty is clear. Our price page lists exactly what to send.

How do I get a quotation?

Use the quote form, call or WhatsApp us with your material, rate, conveying distance and layout. A conveying engineer replies within one working day with a recommendation, and a quote once the duty is clear. Our price page lists exactly what to send.

What does a pneumatic conveying system cost?

There is no fixed price, because the cost depends on the material, the rate, the distance, the number of bends, the blower, the filtration, the controls and the site work. Two systems that both move powder can differ a great deal in cost. We price a line after we understand the duty.

What does a pneumatic conveying system cost?

There is no fixed price, because the cost depends on the material, the rate, the distance, the number of bends, the blower, the filtration, the controls and the site work. Two systems that both move powder can differ a great deal in cost. We price a line after we understand the duty.

What information do you need to size a line?

The material name, form, bulk density and particle size; moisture and temperature at the feed point; throughput in kg/hr; horizontal run and vertical lift in metres; the number of pickup and delivery points; the available power supply; and a layout sketch. Send what you have and we will ask for the rest.

What information do you need to size a line?

The material name, form, bulk density and particle size; moisture and temperature at the feed point; throughput in kg/hr; horizontal run and vertical lift in metres; the number of pickup and delivery points; the available power supply; and a layout sketch. Send what you have and we will ask for the rest.

Ready for a quote?

Send the six facts above. If you only have some of them, send those. We reply within one working day and ask for the rest.

Request your free quote

Step 1 of 2 · takes 30 seconds
What do you need?

How much material per hour? (kg/hr, if you know)

No spam · reply within one working day

Where should we send your proposal?

Prefer to talk? +91 99090 33851 · WhatsApp

Ready when you are

Pneumatic conveying systems engineered for your material.

Tell us your material, rate and route. We reply with a line recommendation within one working day.

[ase_paddle_divider]
Chat with us
Secure form

Get your conveying quote

Step 1 of 2 · takes 30 seconds
What do you need?

How much material per hour? (kg/hr, if you know)

No spam · reply within one working day

Where should we send your proposal?

Prefer to talk? +91 99090 33851 · WhatsApp

SSL-encrypted. Your details go only to our engineers – never shared or sold.